Files
inventory-plus-plus/work-summaries/work-summary-Claude-2026-08-04-2256.md
T
angel 6a473b2ea0 Claude-assisted improvements (untested)
- dev auth flow (side-step OAuth)
- db event processing integration tests
- dev scripts (eg Makefile)
- db / test db migration setup scripts.
2026-08-20 00:35:22 -06:00

16 lines
1.1 KiB
Markdown

# Work Summary — 2026-08-04 22:56
## Task
Address the two `go vet` "unreachable code" warnings that have been showing up alongside test runs since the test-coverage work started surfacing them.
## Changes
Both were leftover dead `return` statements after the surrounding logic was later changed to already return on every path - simple deletions, no behavior change:
- `domains/accounts/accounts.go:1472` (in `SetListingInListingInMockSyncGroupBeingEdited`'s per-schema update loop): a trailing `return nil` after a `switch` whose three cases (`continue`/`return nil`/`return fmt.Errorf(...)`) already cover every value of `RowsAffected()`. Removed the dead line.
- `server/sse/publisher.go:141` (`Push`): a `return nil` sitting after `return errors.Join(errs...)`, which already unconditionally returns. Removed the dead line - `errors.Join(errs...)` was the intended return value all along (returns `nil` itself when `errs` has no non-nil entries, so behavior is unchanged).
## Verification
- `go build ./...` clean.
- `go vet ./...` now fully clean (previously exactly these two warnings).
- `make test`: full suite still green, no regressions.